How to set up a parcel locker: from plot to first parcel
You have land, or capital and a plan, but you have never built a parcel locker site. We assess the land, prepare it, deliver and install the device, connect it and take care of maintenance. You deal with one contractor for the whole project.
- 6,645parcel lockers installedsince 2019 · an average of 3.7 per working day
- 35,781service visitssince 2019 · approx. 5,000 a year
- 1,533sites preparedsince 2019
Order of work
Five stages, one contractor
Each stage completes the one before it, so the order is always the same.
- 01
Site assessment
We check the ground, the water drainage and where power can be brought in from. After the site visit you know whether the land is suitable for a locker and what needs to be done. If you do not have a site yet, we can help you find one: we also source locker sites for operators.
Site preparation → - 02
Site preparation
Levelling, ground stabilisation, a foundation with anchors, block paving around the site and a power connection in a protective conduit.
Site preparation → - 03
Device delivery
We collect the locker from the manufacturer, store it until the site is ready and deliver it to the spot where it will stand.
Locker logistics → - 04
Installation and commissioning
Anchoring, power, controller and connectivity setup, acceptance test. We hand over the locker ready for its first parcel.
Installation → - 05
Upkeep
Maintenance, inspections and repairs. You see every ticket and every service visit in the Coordinator panel, with a photo after the repair.
Maintenance →
What we need to know to get started
Rough answers are enough. Based on them, we arrange a site visit.
- Where you want to put the locker: an address or a region
- Whether you already have a site or are still looking for one
- How many devices you plan to start with
- Whether you are already talking to an operator and have chosen a device
What it costs
The cost depends mainly on the ground, the distance to the power connection and the number of devices. After the site visit we give it to you in writing, broken down by stage.
Tell us about your plan
Tell us where you plan to put lockers and how many. We will reply with where to start and when we can look at the site.